Reports until 12:20, Wednesday 14 January 2015
H1 ISC
evan.hall@LIGO.ORG - posted 12:20, Wednesday 14 January 2015 (16068)
ISC rack patch panel

For the Schnupp asymmetry measurement, one of the patch panel connectors on ISC R1 (by the PSL) is now wired to another patch panel connector on ISC R3 (by HAM6). The wiring is as follows:

Initially, all these ports were labeled as "spare" and most of them were terminated.

The connector on ISC R1 will be driven by an rf signal from an IOT2R PD. The connector on ISC R3 will go into a spectrum analyzer.