06:30 Cris and Karen into LVEA- esit doors will be open
08:00 restarted digital camera images on FOM5
08:13 Rick, Darkham, Thomas and Nutsinee to EY for P-Cal work. Working close to STS.
08:14 :21, :22 Sensor correction is off @ EY to accomodate P-Cal work.
08:22 Sigg rebooting end station ISC
08:23 Gary moving ISS arrays from optics lab to H@ enclosure. Will be using exit doors from LVEA to accomodate. Sigg approves.
08:30 Cyrus installing new edge router for CDS. GC will be down for a few minutes.
08:34 Christina w/exterminator visiting all points to check mouse traps.
08:34 Hugh into CER
08:48 Cris and Karen to Mids
08:52 Jef to LVEA to get a LASER vibrometer.
09:00 Plumber on site for toilet maintanance.
09:02 Kyle called to infor about 2 Praxxair deliveries today.
09:08 Betsy out to W Bay
09:10 J Kissell ramping down SUS in HAM6 for ISI FE Model restart.
09:15 Restart HAM6 ISI FE Model. All sensor correction is turned off except for EX. No DAQ restaert required.
09:18 HAM6 restored and back online.
09:29 Karen leaving MY.
09:40 Praxxair called to announce arrival
09:44 Gary driving to EY to talk to Rick
10:08 Doug out to LVEA to move copper pipes under ITMY.
10:11 Rick et al back from the end station. Can't run excitations.
10:13 Jeff an TJ back from LVEA.HEPI pump ! needs electrial attention. Hugh will give more detail.
10:30 Jeff B back into LVEA by HAM2 vibrometer.
10:49 Betsy and Janine out of th LVEA.
11:15 Sudarshan to EX
12:00 Jef back out to LVEA HAM2
12:12 Jeff out of LVEA
12:15 Fil and co out of LVEA
12:30 Jim out to LVEA to get some parts
13:45 Kyle and Joe out tp EY mechanical room
14:20 Kyle ad Joe back from EY
15:20 Sudarshan out to EY
15:50 Sudarshan back from EY