Reports until 11:31, Monday 02 February 2015
H1 CDS (CDS, ISC)
evan.hall@LIGO.ORG - posted 11:31, Monday 02 February 2015 - last comment - 12:24, Monday 02 February 2015(16410)
Normalized REFLAIR9I alongside REFL9I; nominal ISC cabling restored

The LSC model has been edited to accommodate a normalized REFLAIR9I signal (LSC-TR_REFLAIR9) alongisde normalized REFL9I (LSC-TR_REFL9). A switch determines which of these is signals is fed into LSC-REFLBIAS.

Correspondingly, I have switched back the cabling on the ISC rack so that the demodulated REFL_A_RF9 signals feed into the REFL_A_RF9 whitening chassis, and likewise for REFLAIR_A_RF9.

Images attached to this report
Comments related to this report
alexan.staley@LIGO.ORG - 12:24, Monday 02 February 2015 (16412)

The guardian scripts, whitening settings, and demod phases are now corrected back to their settings prior to the cable swap.