Today, Travis, Giles, and Danny removed the remaining stock ends from the broken fibers on ITMY. Then, with Jason's help they finished setting the UIM, PUM, and ITMy (6each) DOFs appropriately in preparation for fiber welding. This included using the v-block refit with Doug's floating bearings. Other weld equipment was checked over and calibrated in prep (new tweezer tips, etc.). I used the DI N2 gun and the vacuum to do some further cleaning of the structure and the ITMy barrel. I had to dry wipe the top of the barrel mid vacuum to get particulate to come free from the surface. In the end, I think the vacuum with small OD PTFE hose lightly touching the barrel surface did the best job there. Numbers are being checked once more and we expect to be welding by tomorrow.