== Daily Ops Summary == 06:50 Jeff to LVEA/PSL 07:30 Karen to LVEA 08:00-10:00 Jeff runs a test on HEPI pump servo 08:02 Peter King to H2 enclosure 08:04 Rick worked on PSL. IMC state DOWN, input to frequency servo disabled 08:11 Corey to EX (30 mins) 08:16 Andreas and Aiden to TCS area around HAM4 08:30 Jamie runs Guardian upgrade testing on ITMX seismic system Fil and Richard to HAM4, 5 ISI and STS2 NDS servo shutdown 09:00 Joathan and a visitor went to LVEA 08:45 Sudarshan and Thomas to End Y (PCal) 09:00 Cyrus to LVEA Karen to Mid Y 09:17 Cyrus back 09:04 Corey back from EX -> heading to VLEA 09:06 Ali to EX, EY 09:24 Doug to LVEA H1 PSL Area Matt to H2 enclosure 09:26 Hugh to LVEA 09:40 Karen left Mid Y Jeff restarted pump servo (EX) Travis taking TFs (ETMX SUS) 9:50 Corey back Jonathan and the visitor back Jeff - HEPI Pump servo mag. sys. identificaion 10:00 Jim restarting PEM model for Corner, Mid, and End stations Jim restarting TCS (Corner Station) Doug back from the LVEA 10:31 Aiden and Alestair to X manfold lab 10:46 Jeff done with pressure servo test 11:05 TJ and Mitch - forklift from mech. room to VRW 11:09 Travis done measuring TFs (ETMX) 11:15 Jeff brought down ETMX chamber 11:19 Jeff brought ETMX to safe 11:25 Thomas and Sudarshan back 11:09 Travis done measuring TFs 11:15 Jeff brought down ETMX Chamber 11:19 Brought ETMX Chamber to SAFE 11:25 Sudarshan and Thomas back 11:30 Rick et al back, IMC locked 11:37 Jim restarted DAQ 12:58 Jim restarted OAF 15:52 Peter K. back Happy Maintenance Day
And tumble weed baling in the morning.