07:51 Karen and Cris in the LVEA 07:58 Jim W. turning off HEPI to ISI feedforward on all BSC chambers to run measurement for ~ 20 min. 08:03 Hugh restarting end Y HEPI pump servo 08:15 Aidan going through the LVEA on the way to the high bay 08:18 Jeff B. to LVEA to look at dust monitors, work with Mitchel in West bay on bag and tag 08:21 Rick to end Y 08:40 Christina driving forklift from LSB to high bay 08:45 Sudarshan and Thomas to end Y for PCAL work 08:49 Cris to mid X 08:50 Alastair to LVEA to check on TCS laser 08:57 Aidan working on 3IFO near HAM6 09:01 Rick back from end Y 09:12 Betsy and Travis to the West bay 09:19 Andres moving 3IFO parts from the LVEA to the staging building 09:28 Doug to LVEA to take pictures 09:51 Richard to LVEA 09:56 Jeff B. and Doug out of LVEA 09:58 Jim W. running measurement on ETMY 10:00 Mitchel out of LVEA 10:03 Thomas and Nutsinee back from end Y 10:14 Travis and Betsy out of LVEA 10:45 Dave B. to CER to check on TCS AA chassis 10:51 Dave B. and Aidan to CER to power on TCSY AA chassis, does not work, Filiberto and Aidan investigating 11:37 Thomas and Elli back from end X 11:41 Thomas and Elli to end Y 11:42 Bubba to mid X to check on possible noisy air handler 11:54 Kiwamu starting WP 5047 11:56 Bubba back from mid X 12:09 Thomas and Elli back from end Y 12:16 Kiwamu restarting SUS ETMY model Bubba back to mid X 13:39 DAQ restart for new CALCS model 15:03 Jim W. to HAM5 to read serial number off box