Reports until 16:14, Friday 13 February 2015
LHO General
patrick.thomas@LIGO.ORG - posted 16:14, Friday 13 February 2015 (16727)
Ops Summary
08:01 I changed the state bit from Undisturbed to Commissioning. However there is an entry on the card reader for Peter K. entering the LVEA at 6:50 AM. Karen and Cris also entered the LVEA after Peter and before 08:01.

08:04 Corey to the squeezer bay for 3IFO work
08:13 Alastair to the LVEA to check on the TCSY laser
08:49 Thomas and Elli to end X and end Y to reboot PCAL computers
09:34 Thomas and Elli back
09:34 Jim W. working on HAM4 in the control room
09:38 Corey done
09:43 Filiberto and Manny back from end X, were soldering cables
09:45 Filiberto to end X
10:08 Filiberto back
~11:18 Richard, Peter and Kiwamu working on installation of low pass filter for IOO periscope piezo controller
11:53 Richard back
12:42 Betsy running transfer functions on ETMX, optical lever damping turned off
12:49 Travis starting measurement on SRM
13:16 Karen opening outside rollup door in OSB shipping/receiving
13:16 Elli to LVEA to refocus ITM cameras
13:21 Kiwamu to IOT2L table to check if ghost beam is on photodiodes
13:32 Kiwamu back
15:49 Nutsinee to end X to change PCAL camera autofocus from manual to auto