08:01 I changed the state bit from Undisturbed to Commissioning. However there is an entry on the card reader for Peter K. entering the LVEA at 6:50 AM. Karen and Cris also entered the LVEA after Peter and before 08:01. 08:04 Corey to the squeezer bay for 3IFO work 08:13 Alastair to the LVEA to check on the TCSY laser 08:49 Thomas and Elli to end X and end Y to reboot PCAL computers 09:34 Thomas and Elli back 09:34 Jim W. working on HAM4 in the control room 09:38 Corey done 09:43 Filiberto and Manny back from end X, were soldering cables 09:45 Filiberto to end X 10:08 Filiberto back ~11:18 Richard, Peter and Kiwamu working on installation of low pass filter for IOO periscope piezo controller 11:53 Richard back 12:42 Betsy running transfer functions on ETMX, optical lever damping turned off 12:49 Travis starting measurement on SRM 13:16 Karen opening outside rollup door in OSB shipping/receiving 13:16 Elli to LVEA to refocus ITM cameras 13:21 Kiwamu to IOT2L table to check if ghost beam is on photodiodes 13:32 Kiwamu back 15:49 Nutsinee to end X to change PCAL camera autofocus from manual to auto