Displaying reports 1-20 of 13962.Go to page 1 2 3 4 5 6 7 8 9 10 End

Search criteria
Section: H1
Task: General

REMOVE SEARCH FILTER
SEARCH AGAIN
Reports until 07:35, Thursday 26 February 2026
H1 General
oli.patane@LIGO.ORG - posted 07:35, Thursday 26 February 2026 (89277)
Ops DAY Shift Start

TITLE: 02/26 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 6mph Gusts, 3mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.26 μm/s 
QUICK SUMMARY:

HAM1 work is quickly heading towards doors!

H1 General
oli.patane@LIGO.ORG - posted 16:35, Wednesday 25 February 2026 - last comment - 16:39, Wednesday 25 February 2026(89270)
Ops DAY Shift End

TITLE: 02/26 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: More HAM1 work done today, we're very close to closing
LOG:
Sophie will post log as comment

Comments related to this report
sophie.muusse@LIGO.ORG - 16:39, Wednesday 25 February 2026 (89271)

                             

Start Time System Name Location Lazer_Haz Task Time End
22:49 SAF LVEA is Laser SAFE LVEA NO* LVEA is Laser SAFE *Bifurcated HAM1/2* 17:19
15:40 FAC Randy EY n Working on cleanrooms 16:55
16:10 VAC Betsy LVEA YES Turning purge air down 16:14
16:10 FAC Kim, Nellie LVEA YES Tech clean 17:01
16:24   Camilla LVEA YES Transitioning to laser safe 16:48
16:33   Betsy, Gabriele LVEA YES Double checking and moving IOT1 16:47
17:20 JAC Jason, Jennie LVEA n Removing beam dump and viewport simulator 18:05
17:20 SEI Jim LVEA n SEI wiring and checks 20:03
17:24 FAC Randy LVEA n Moving scissor lift 18:15
17:27 SPI Jeff, Josh OpticsLab y(local) SPI work (Jeff out 18:00) 22:10
17:32 FAC Nellie HAM Shack n Tech clean 17:54
17:32 FAC Kim EX n Tech clean 18:23
17:38 EE Fil LVEA n Grounding loop checks 19:54
17:48 EE Marc LVEA n Grounding loop checks 19:54
18:23 FAC Kim MX n Tech clean 18:56
18:24   Betsy LVEA n   18:33
18:45 FAC Randy LVEA n Moving forklift 19:13
18:56 SPI Jason LVEA YES Grabbing lens in PSL anteroom for SPI 19:13
19:19 VAC Jordan, Gerardo LVEA n Checking out pump 19:44
20:32 FAC Randy LVEA n Scissor lift craning 21:23
20:54 EE Fil, Jim, Marc LVEA n Fixng PM1 grounding issue 22:31
20:56 FAC Chris LVEA n Grabbing bottle cart 21:16
21:19 BHD Camilla, Elenna OptLab n Opening OMCs 22:32
21:20 TCS Sophie JOAT Lab y(local) CHETA laser work 00:28
21:23   Betsy LVEA n Helping out at HAM1 22:25
21:34 SPI RyanS OptLab n Inspecting optic 22:09
21:39 FAC Randy LVEA n Craning scissor lift 22:13
21:51 FAC Jordan, Gerardo LVEA n Helping with craning 22:09
21:54 TCS Gabriele JOAT Lab y(local) Helping with CHETA work 23:32
21:58   Richard LVEA n Trying to catch someone doing something wrong 22:09
22:10 SPI Josh OptLab n SPI work 00:10
22:32 SEI Jim LVEA n SEI checks 00:02
22:40 TCS Camilla JOAT Lab y(local) Helping with CHETA work 00:27
22:42 SUS Betsy LVEA n PM1 OSEM replacement 23:03
23:04 VAC Travis, Jordan, Gerardo LVEA n BSC8 pump work 01:04
H1 General
oli.patane@LIGO.ORG - posted 07:34, Wednesday 25 February 2026 (89255)
Ops DAY Shift Start

TITLE: 02/25 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 9mph Gusts, 6mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.19 μm/s 
QUICK SUMMARY:

More JAC work today

H1 General
anthony.sanchez@LIGO.ORG - posted 14:56, Friday 20 February 2026 (89215)
Quarterly trends of HWWD bits for indication of negative function

Famis 39976 Inspect quarterly trends of HWWD bits for indication of negative function

All traces have had some motion on it in the last 91 days.

Images attached to this report
H1 General
oli.patane@LIGO.ORG - posted 16:39, Thursday 19 February 2026 (89204)
Ops DAY Shift Start

TITLE: 02/20 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: More HAM1 alignment work today
LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          

Start Time System Name Location Lazer_Haz Task Time End
22:49 SAF LVEA is Laser SAFE LVEA NO* LVEA is Laser SAFE *Bifurcated HAM1/2* 16:49
15:00 FAC Nellie LVEA YES Tech clean 15:04
15:00 FAC Kim LVEA YES Tech clean 15:38
15:30 FAC Randy LVEA n Working on test stand 19:58
16:17 VAC Jordan LVEA YES Turning down HAM1 purge air, HAM7 continuing leak checks 16:24
16:30 EE Fil MER n Electronics work 18:32
16:36 FAC Kim LVEA YES Tech clean 17:23
17:13 JAC Keita LVEA YES JAC alignment 20:11
17:13 VAC Gerardo LVEA YES Turning up HAM1 purge air 17:17
17:20 EE Marc MER n Joining Fil for electronics rack work 18:32
17:22 JAC Jason LVEA YES JAC alignment 20:23
17:59 VAC Jordan, Travis LVEA n HAM7 leak checks 18:23
18:21 SPI RyanS OpticsLab y(local) SPI setup 21:42
18:24 JAC Jennie LVEA YES JAC alignment 20:11
18:39   Betsy LVEA YES JAC work 20:23
18:50 JAC Rahul LVEA YES Checking on JAC team 19:02
18:51 SUS Ibrahim LVEA n Helping Randy at test stand 19:58
19:10 VAC Gerardo, Jordan, Travis LVEA n CP1 pump 20:11
19:14 SPI Jeff OpticsLab y(local) SPI work 21:42
20:07 PEM Robert EX n Grounding himself 21:23
20:49 FAC Randy LVEA n Test stand work 23:01
21:21 TCS Sophie JOAT Lab n Taking photos 21:39
21:55   Betsy LVEA YES Opening light pipe 21:57
21:56 TCS Sophie JOAT Lab n Taking more pictures 22:03
22:03 FAC Ibrahim LVEA n Test stand work 23:01
22:43 JAC Jason, Keita LVEA YES JAC alignment 00:43
22:48 EE Marc LVEA n Cable intel 23:44
22:55 TCS Sophie, Shreyan JOAT Lab n Populating tables ongoing
23:01 SPI RyanS OptLab n Setting up SPI 00:23
23:03 JAC Jennie LVEA YES JAC alignment ongoing
23:11 FAC Tyler, 2 contractors LVEA n Checking out HVAC equipment 23:36
23:25 JAC Betsy LVEA YES JAC allignment 00:06
23:26 SPI Jeff OptLab n SPI work 00:18
23:35 EE Tony, Fil LVEA N Grabbing Ladder 23:57
H1 General
oli.patane@LIGO.ORG - posted 07:33, Thursday 19 February 2026 (89192)
Ops DAY Shift Start

TITLE: 02/19 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 17mph Gusts, 10mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.36 μm/s 
QUICK SUMMARY:

More HAM1 work today

H1 General
oli.patane@LIGO.ORG - posted 16:56, Wednesday 18 February 2026 (89186)
Ops DAY Shift End

TITLE: 02/19 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM1 work continued today
LOG:                                                                                                            

Start Time System Name Location Lazer_Haz Task Time End
15:42 FAC Crane tech LVEA YES Crane work 17:58
15:45 VAC Gerardo LVEA YES Turning down purge air 16:00
15:45 FAC Kim, Nellie LVEA YES Tech clean (Nellie out 16:24) 16:28
16:55 SUS Fil LVEA YES Swapping cables for PM1 troubleshooting 17:02
16:59   Camilla LVEA n Looking for parts 17:08
17:00 FAC Kim LVEA n Tech clean 17:32
17:08 FAC Nellie MY n Tech clean 16:08
17:11 FAC Randy LVEA n Measuring test stand 17:54
17:33 FAC Kim MX n Tech clean 18:23
17:49 SUS Fil LVEA YES Swapping more cables for PM1 troubleshooting 17:57
18:12 EE Marc MER n   20:02
19:00 SUS Fil LVEA YES Swapping back cables 19:10
19:04 JAC Jennie, Jason LVEA YES HAM1 alignment 20:53
19:04 VAC Gerardo LVEA N Turning up HAM1 purge air 19:18
19:05 TCS Camilla, Sophie, Shreyan Prep Lab Local CHETA table work 20:18
19:09 JAC Keita LVEA YES Joining JAC crew 20:53
19:16 SUS Rahul LVEA YES Helping with JM3 20:54
19:16 JAC Betsy LVEA YES Wiring up JAC table 20:25
19:18 VAC Jordan LVEA n Checking on HAM7 vacs 20:03
20:20 PEM Robert EX n Grounding himself 21:44
20:29   RyanC CER n Putting away dust monitor 20:32
20:35 EE Marc, Fil MY n Picking up cables 22:05
21:31 TCS Camilla, Sophie, Shreyan Prep lab LOCAL CHETA table work 22:56
21:34 FAC Richard LVEA N/Y Safety checks 21:46
21:41 VAC Travis, Jordan LVEA n Setting up leak checker on HAM7 23:11
22:28   Betsy LVEA YES Checking out JAC table 23:05
22:36 VAC Gerardo LVEA YES Turning down purge air 22:16
22:50 PEM Robert EX n Geting more grounded 00:55
23:02   Betsy LVEA YES Turning purge air back up 23:30
23:29 SUS Rahul LVEA YES Adjusting JM3 osem flags 23:55
23:37 JAC Jason, Keita LVEA YES JAC alignment ongoing
23:40 JAC Betsy LVEA yes JAC table work ongoing
00:04 VAC Travis, Jordan LVEA n HAM7 leak checking 00:31
00:16 TCS Camilla, Sophie OpticsLab n CHETA work ongoing
00:17 TCS Camilla, Sophie LVEA YES Checking in with Betsy 00:31
H1 General
oli.patane@LIGO.ORG - posted 07:32, Wednesday 18 February 2026 (89179)
Ops DAY Shift Start

TITLE: 02/18 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 3mph Gusts, 1mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.44 μm/s 
QUICK SUMMARY:

More HAM1 work today

H1 General
ryan.crouch@LIGO.ORG - posted 16:30, Thursday 12 February 2026 (89135)
OPS Thursday Day shift summary

TITLE: 02/12 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Dave did some CDS restarts early in the day, alog89133, and alog89130 and again at the end of the day. Secondary microseism has gone up quite a lot in the past 9 hours, presumably from the 10.5m (windy.com) waves crashing into the Juneau/Ketchikan area north of Washington state. VAC team left an AUX cart pumping down by HAM4. HAM1 alignment and EOM crystal work continued today.
LOG:                                                                                                                                                                                                  

Start Time System Name Location Lazer_Haz Task Time End
22:49 SAF LVEA is Laser SAFE LVEA NO* LVEA is Laser SAFE *BIFURCATED HAM1/2 16:49
16:17 FAC Kim LVEA N* Tech clean 17:51
17:14 EE Marc, FIl MSR, Mez, LVEA N* Cable pulling for BHD 00:01
17:18 FAC Mitch LVEA N* Checks 17:35
17:22 FAC Richard LVEA N* BSC2, HAM3/4 area checks 17:35
17:24 ISC Jason LVEA Y HAM1 JAC work 18:50
17:27 ISC Keita LVEA Y HAM1 18:55
17:33 ISC Jennie LVEA Y HAM1 work 20:08
17:58 FAC Randy LVEA N* Talk to Fil and Marc 19:02
18:14 FAC Richard LVEA N BSCs 1,2,3 checks 18:50
18:15 FAC Kim EndY N Restock garb 18:15
18:39 ISC Betsy Optics lab then HAM1 N, Y Check in with crew, parts dropoff 20:08
18:53 VAC Gerardo, Jordan HAM4/5 N* Swap ion pump, Gerardo out at 1930 back in 2000 20:18
18:55 ISC Camilla LVEA Y HAM1 20:04
18:56 ISC Keita, Elenna Optics lab N EOM, Keita out 2022 20:20
18:56 ISC Camilla Optics lab N eom 18:56
19:34 VAC Travis LVEA N* Talk to VAC crew 19:43
19:53 VAC Travis LVEA Y Help swap pump 20:18
21:02 FAC Randy LVEA N* BSC2 platform work, height laser hazard 21:40
21:04 ISC Keita, Elenna Optics lab N EOM 23:00
21:29 VAC Jordan LVEA Y HAM4/5 pump work 22:32
21:31 VAC Gerardo LVEA Y Join Jordan 22:32
21:44 SQZ Camilla LVEA N* SQZ bay 22:00
22:05 ISC Jason, Jennie LVEA Y HAM1 work, Jennie out 23:30 Ongoing
22:20 SQZ Sheila, Camilla Optics lab N Checks, Sheila out at 23:08 23:35
22:34 PEM Robert EndX N Ground work, back to CS at 00:00 then back out Ongoing
22:36 ISC Betsy Optics lab, HAM1 N/Y Parts, help teams out 23:55
23:00 ISC Keita, Elenna LVEA Y HAM1 in at 23:00, Elenna out 00:22 01:09
H1 General
ryan.crouch@LIGO.ORG - posted 07:32, Thursday 12 February 2026 (89126)
OPS Thursday day shift start

TITLE: 02/12 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 3mph Gusts, 1mph 3min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.28 μm/s 
QUICK SUMMARY:

H1 General
ryan.crouch@LIGO.ORG - posted 16:31, Wednesday 11 February 2026 (89118)
OPS Wednesday Day shift summary

TITLE: 02/12 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM1 work continues, HAM7 is pumping down.
LOG:                                                                                                                             

Start Time System Name Location Lazer_Haz Task Time End
22:49 SAF LVEA is Laser SAFE LVEA NO* LVEA is Laser SAFE *BIFURCATED HAM1/2 16:49
16:10 FAC Kim LVEA N* Tech clean 17:30
17:10 SQZ Keita Optics lab LOCAL EOM 19:15
17:17 EE Marc, Fil LVEA, CER N* Pulling cables 00:46
17:28 FAC Mitch LVEA N Checks, WEST BAY 17:46
17:30 FAC Kim EndX N Tech clean 18:48
17:40 ISC Betsy LVEA N* Parts 17:48
17:49 SQZ Betsy Optics lab LOCAL Join Keita 19:15
17:54 ISC Camilla LVEA N* Bring out dog clamps 18:49
17:59 SQZ Elenna Optics lab LOCAL Join Keita 19:15
18:06 FAC Randy LVEA N /Y BSC2 tent, at height hazard 18:24
19:01 ISC Jason, Oli, Jennie LVEA Y HAM1, refl path, Viewport simulator 20:00
19:21 FAC Eric EndX N Chiller yard checks 19:35
21:20 SQZ Keita Optics lab LOCAL EOM? 23:32
21:33 ISC Jason, Jennie, Tony LVEA Y HAM1 work,  refl alignment ongoing
21:59 VAC Gerardo, Jordan LVEA N* HAM4 annulus ion work,  height laser hazard 23:16
22:14 FAC Mitch LVEA N West bay checks 23:09
22:26 FAC Richard LVEA N* Safety checks 22:50
22:35 SQZ Betsy Optics lab LOCAL Join Keita 23:36
00:29 ISC Betsy LVEA Y HAM1 Ongoing

18:15 UTC HAM7 SEI SW watchdog trip from a H7 crash, FE & ADC errors on IOPSUSH7 SUSFC1, SUSSQZIN SUSAUXH7, IPC and DK error on SEIH7.

Dave restarted everything ~20 minutes later

H1 General
ryan.crouch@LIGO.ORG - posted 07:34, Wednesday 11 February 2026 (89117)
OPS Wednesday Day shift start

TITLE: 02/11 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 9mph Gusts, 7mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.21 μm/s 
QUICK SUMMARY:

H1 General (Lockloss)
oli.patane@LIGO.ORG - posted 17:06, Thursday 05 February 2026 (89058)
Lock duration and ETM glitch lockloss stats through all of O4c

I never made updated plots for the lock duration and prevelance of the DARM glitch locklosses for the last couple months of O4c (up to Sept 1st, 2025, up to Oct 1, 2025), so here they are. The performance during October and November mostly line up with what we had been seeing in August and September following the bias change (86027).

Through October and November, the frequency of DARM glitch locklosses, and locklosses in general, was still lower than they had been before the ESD bias change. October went realy well. November wasn't the best month for ETM glitch locklosses - we had 8 locklosses due to ETM glitch during the month. That's only slightly worse than the amount we saw in August right after the bias was doubled, but during November we were locked for less time overall due to O4c ending on November 18th and PEM week not requiring us to keep the IFO locked overnight or on weekends, so that's not the best. However, we still had longer locks on average during November vs before the bias change.

O4 DARM Glitch vs All Locklosses
O4c Lock Length Distribution
O4c Lock Stats

Images attached to this report
H1 General
oli.patane@LIGO.ORG - posted 16:32, Wednesday 04 February 2026 (89036)
Ops Day Shift End

TITLE: 02/05 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM7 door is on! 
LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                        

Start Time System Name Location Lazer_Haz Task Time End
22:49 SAF LVEA IS LASER SAFE LVEA NO* LVEA IS LASER SAFE *BIFURCATED HAM1/2 bring ur LASER GOGGLES 16:49
15:44 FAC Randy LVEA n Prepping for HAM7 door 16:11
16:07 FAC Nellie OpticsLab, LVEA n Tech clean 17:21
16:13 FAC Kim LVEA n Tech clean 17:29
16:36 FAC Randy LVEA n Craning Emod 17:12
17:02 TCS Matt JOAT Lab n Inventory 17:59
17:30 SUS Rahul LVEA YES PM1 troubleshooting 19:00
17:32 JAC Keita LVEA YES JAC work 20:59
17:40 JAC Jennie LVEA YES JAC work 20:52
17:57 SQZ Sheila LVEA n Checking on HAM7 18:11
18:08 FAC Nellie EY n Tech clean 18:48
18:28 SEI Jim LVEA n Unlocking ISI and taking measurements 17:43
18:44 JAC Masayuki LVEA YES JAC work 20:59
19:06 EPO Corey LVEA n Taking photos of HAM7 19:52
19:17 VAC Gerardo LVEA n Checking on Corey 19:22
19:34 BHD Elenna OpticsLab n BHSS optics 20:18
19:35 SQZ Camilla, Sheila LVEA n SQZ rack grounding loop checks 20:45
20:21 JAC Elenna, Mitchell Optics lab n Getting parts (Mitchell out 20:34) 21:16
20:25 JAC Jason, RyanS LVEA n Populating JAC table 18:25
20:27 PCAL Tony PCAL Lab y(local) Starting a measurement 23:50
20:45 VAC Gerardo LVEA n HAM7 door 22:45
20:58 VAC Jordan LVEA n HAM7 door 23:07
20:59 FAC Randy LVEA n HAM7 door 23:08
21:07 VAC Travis LVEA n HAM7 door 23:07
21:44 TCS Camilla, Matt LVEA n Turning eye-safe HWS lasers on 21:52
22:07 JAC Masayuki, Jennie LVEA YES JAC work ongoing
22:07 JAC RyanS, Jason LVEA n JAC table work 00:17
22:10 JAC Keita LVEA YES JAC work ongoing
22:48 BHD Elenna OpticsLab n BHSS optics ongoing
22:59 BHD Camilla OpticsLab n BHSS optics ongoing
H1 AOS (EPO, SQZ, SUS, SYS)
corey.gray@LIGO.ORG - posted 15:55, Wednesday 04 February 2026 - last comment - 08:42, Thursday 05 February 2026(89034)
HAM7 Closeout Photos

Squeezed in a quick photoshoot of HAM7 (right after ISI-unlocking/measurements by Jim + purge air being turned up and before Door Team sealed it up).  HAM7 was open roughly from 11:16am-11:48amPDT for photos.  Since there was only one door off, lighting wasn't great and limited to shots from the -X side of HAM7.  Used Canon DSLR camera followed by iPhone shots; snapped a handful of macro lens shots for fun.  

Photo Album (109photos) uploaded to Google folder HERE.

Images attached to this report
Comments related to this report
camilla.compton@LIGO.ORG - 08:42, Thursday 05 February 2026 (89045)

Attaching photo of the photographer! 

Images attached to this comment
H1 General
oli.patane@LIGO.ORG - posted 07:33, Wednesday 04 February 2026 (89022)
Ops Day Shift Start

TITLE: 02/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 6mph Gusts, 5mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.43 μm/s 
QUICK SUMMARY:

Work continues in chamber

Reminder that the LVEA is LASER SAFE EXCEPT around HAM1/2 and at height.

H1 General
oli.patane@LIGO.ORG - posted 16:40, Tuesday 03 February 2026 (89019)
Ops Day Shift End

TITLE: 02/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:  Lots of work towards finishing up in HAM1 and HAM7, including some surfing! LVEA is still LASER SAFE except behind the curtasins by HAM1/2 and at height.
LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              

Start Time System Name Location Lazer_Haz Task Time End
22:49 SAF LVEA IS LASER SAFE LVEA NO* LVEA IS LASER SAFE *BIFURCATED HAM1/2 bring ur LASER GOGGLES 16:49
15:54 FAC Kim, Nellie LVEA Y/N Tech clean (Nellie out 17:04) 17:06
16:37 FAC Mitchell LVEA n Grabbing stuff 17:19
16:39 FAC Randy LVEA YES Craning near BSC2 20:30
16:55 PCAL Dripta, Tony EY YES PCAL measurements 19:56
17:00 FAC Chris, pest control LVEA Y/N Pest control 16:30
17:01 FAC Chris, pest control XARM, YARM n Pest control 18:31
17:03 FAC Nellie MY n Tech clean 17:10
17:06 VAC Gerardo LVEA Y/N Turning down purge air for HAM1 and HAM7 17:21
17:29 FAC Eric EX n Chiller yard work 18:07
17:41 SPI Jeff, Jim OptLab y(local) SPI work 21:03
17:54 FAC Kim EX n Tech clean 18:57
17:55 FAC Nellie MY n Tech clean 18:42
18:11 VAC Gerardo LVEA YES Turning up purge air 18:16
18:19 JAC Masayuki, Keita LVEA YES JAC mode-matching 20:07
18:31 JAC Jennie LVEA YES JAC work 20:07
18:31 JAC Jason, RyanS LVEA n JAC table 20:04
18:33 FAC Chris Mids, Ends n FAMIS tasks 20:22
18:41 VAC Gerardo LVEA n Turning HAM7 purge air up 18:51
19:04 SUS Rahul, Fil LVEA YES Troubleshooting PM1 19:11
19:24   Betsy OptLab, LVEA YES Cleaning up JAC stuff 20:30
19:39 FAC Kim LVEA n Putting away garb 20:13
19:41 VAC Gerardo LVEA n Turning on turbo pumps for FAMIS 20:41
20:46 PCAL Tony, Dripta EY YES PCAL measurements 01:32
21:01 SUS Rahul LVEA YES SUSing out PM1 23:05
21:06 FAC Randy LVEA YES Moving forklift to HAM7 and being the ocean that carries the surfboard 23:13
21:07   Jennie LVEA YES Helping move barriers for Randy 21:24
21:26   Betsy LVEA n Going out to help with surfing 23:42
21:27 SQZ Sheila LVEA n Surfing 23:56
21:28 JAC Keita, Jennie LVEA YES JAC work (jennie out 23:13) 15:08
21:35 JAC Jason, RyanS LVEA n JAC table work 01:37
21:35 SEI Jim LVEA n Locking HAM7 ISI 22:25
21:35   Camilla LVEA n Watching Sheila surf 00:19
21:59 JAC Masayuki LVEA YES JAC work 01:18
21:59 VAC Gerardo LVEA n Turning off turbo pumps 22:32
22:00 FAC Tyler LVEA n Talking to Betsy 22:14
22:33 FAC Chris MY n Snorkel lift work 23:05
22:33 SPI Jeff, Jim OpticsLab y(local) SPI work 23:48
22:34 FAC Chris LVEA n FAMIS tasks 21:49
22:58 BHD Elenna OpticsLab y(local) Putting away optics 23:14
23:21 JAC Jennie LVEA YES JAC work 01:37
23:27   KarMeng LVEA n Checking out HAM7 00:19
23:29   Travis LVEA n Grabbing parts 23:48
23:42   Betsy LVEA YES Helping with JAC 23:56
00:35   Camilla LVEA n Getting laptop 00:38
H1 General (CDS, OpsInfo, SEI, SUS)
anthony.sanchez@LIGO.ORG - posted 17:17, Monday 02 February 2026 (88997)
Monday Ops Day of Mysteries

TITLE: 02/03 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LVEA was Bifircated via a Laser Hazard areas around HAM 1& 2, while the rest of the LVEA is LASER SAFE unless at height. See M2600004 for details.

PM1 was mysteriously dancing & Saturating too much for Rahul's transfer function measurement all day long. While he was troubleshooting. Update!!! Rahul dragged the EE guys out and found a dead Coil Driver! Mystery solved!

JAC work continued all day starting with mode matching in HAM1, and starting a JM2 swap. JAC table now has all the mounts and Cables but no optics yet. 

HAM7 & ITMY ISI Watchdogs tripped at 23:33 UTC due to mysterious high frequency ground noise that was louder at HAM7 than ITMY.  Jim & Betsy went to go look for fallen wrenches or other watchdog tripping phenomena..... No explanation was ever found. 

OPS info: 
New conda ENV doesn't run watchdog untripping scripts unless you run Conda Kill first.  Tagging CDS. 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
22:49 SAF LVEA IS LASER SAFE LVEA NO* LVEA IS LASER SAFE *BIFURCATED HAM1/2 bring ur LASER GOGGLES 16:49
15:35 FAC Nellie Optics Lab n Tecnical cleaning 15:55
15:37 JAK Betsy LVEA y checking status of LVEA 16:37
15:44 FAC Kim LVEA y technical cleaning 17:55
16:50 SAFETY Travis LVEA yes Setting up barriers for Bifurcated laser hazard  conditions. 17:26
16:56 Cheta Camilla, Matt, Sophie CHETA  lab Yes Updating Camilla on CHETA lab status 18:55
17:06 FAC Nellie LVEA y Technical Cleaning 17:55
17:16 Cheta Ryan CHETA Lab y Getting Optics 17:23
17:21 PSL Jason LVEA yes Energizing the rotation stage to 1 W. 17:30
17:22 Safety Jenny D LVEA y Setting up barriers for Bifurcated Laser zones. 17:26
17:26 SUS Rahul Remote n Taking TF meas. of PM1 18:26
17:28 VAC Travis LVEA y Reducing purge air in HAM1 17:30
17:35 SPI Jeff Optics lab Yes Working on SPI in the Optics Lab. 20:34
17:57 CHETA Ryan S CHETA LAB y Getting optics parts 18:12
18:06 FAC Kim Mid X n technical cleaning 18:54
18:09 SEI Jim LVEA HAM7 n Balancing HAM7 ISI 19:19
18:15 SEI Mitchel LVEA HAM78 N Balancing HAM7 19:19
18:28 VAC Travis LVEA HAM1 y Turning up purge air 18:33
18:30 SUS Rahul LVEA & Optics lab y getting & cleaning parts 18:55
18:31 Laser Trans Oli LVEA Y Laser transitioning to Strange Laser Bifurcated State 18:41
18:34 SQZ Sheila & Karmeng SQZr Racks n Checking on SQZr racks 21:31
18:45 JAC Masayuki & Jason LVEA HAM1 YES JAC Mode matching 20:19
18:48 JAC Ryan S LVEA HAM1 YES Taking picures of JAC & pluggin in the JAC Table. 19:06
18:55 FAC Kim HAM SHAQ N Technical Cleaning 20:25
19:12 TCS Matt OptLab y(local) Putting stuff away 19:18
19:45 VAC Gerado LVEA yes/no Anulus pump work 20:24
19:47 ISC Mitchel LVEA West bay n Getting parts. 20:07
20:09 JAC Jennie LVEA HAM1 YES Checking on Jason and Masayuki 20:19
20:49 LASER SAFETY Travis LVEA HAM1 YES Adjusting the LASER Curtain. 21:03
20:55 FAC Randy LVEA n heading to the WEST Bay area for parts. 22:20
20:56 JAC Betsy Optics Lab y Checking for parts and progress. 22:56
21:01 SPI Jeff & Jim Optics lab Yes Working on SPI 23:01
21:11 EE Marc LVEA HAM1 yes Working with the HAM1 crew 22:56
21:21 JAC Ryan S LVEA JAC Table N working on the JAC table 01:51
21:27 VAC Travis LVEA HAM1 yes Adjusting the Purge air back down for a SUS measuremnent 22:29
21:28 SUS Rahul Remote. N JAC PM1  SUS TF Measurement 22:13
21:36 JAC Jennie W LVEA JACt & HAM1 n/Y working with Ryan S on JAC table, & Waiting for HAM1 crew. 00:00
21:37 SUS Rahul LVEA HAM1 Y Checking PM1 SUS  status 22:12
21:58 FAC Mitchel LVEA West bay N Checking inventory & Parts 22:35
22:05 JAC Betsy LVEA N Running parts 23:59
22:23 JAC Masiuki & Jason LVEA HAM1 Yes Working on Mode matching with JAC 01:58
22:31 JAC Keita LVEA HAM1 Yes Helping HAM1 crew 01:56
22:34 VAC Travis LVEA HAM1 Turning up the Purg air in HAM1 22:43
23:00 JAC Betsy LVEA yes Running parts 23:30
23:39 VAC Travis HAM Shaq N Getting parts. 23:45
23:54 CHETA Camilla Optics Lab N Checking supplies. 00:00
00:06 SUS Rahul LVEA yes Power cycling Satilite boxes 00:10
00:06 SEI Jim LVEA N Walking through the LVEA looking for fallen wrenches & unwatched dogs 00:46
00:10 SEI Betsy LVEA yes Walking around looking Unwatched Dogs 00:30
00:18 SUS Fil & Rahul LVEA HAM1 yea power cycling sat amps to troubleshoot SUS OSC rahul out early 00:57
00:28 EE Marc LVEA HAM1 yes Giving Fill a hand 00:57

 

Images attached to this report
H1 General (Laser Safety, Laser Transition, OpsInfo)
anthony.sanchez@LIGO.ORG - posted 10:59, Monday 02 February 2026 (88990)
LVEA is now in a LASER Safe Bifricated configuration

The LVEA is now in a LASER Safe Bifricated configuration, which means that HAM1 is still in LASER HAZARD along with any work done at height.  There are barricades up designating the Bifricated area.

WP: https://services2.ligo-la.caltech.edu/LHO/workpermits/view.php?permit_id=13010
SOP: https://dcc.ligo.org/LIGO-M2600004

The rest of the LVEA is Laser Safe.  So if you are heading into the LVEA, have your laser goggles with you so if you are forced to walk over near HAM1 you'll have your goggle with you. 

Displaying reports 1-20 of 13962.Go to page 1 2 3 4 5 6 7 8 9 10 End