LVEA: Laser Hazard Observation Bit: Commissioning 08:21 Betsy – Running TFs on ETMX and SR2 08:23 Corey – 3IFO work in H2 Squeezer bay 08:25 Filiberto – Pulling cables at HAM6 08:49 Mitch – 3IFO work in West Bay 08:55 Cris – Cleaning at Mid-X 08:55 Karen – Cleaning at End-Y 09:03 Mitch – Out of LVEA 09:15 Travis – Going into the LVEA looking for tooling 09:22 Doug – Going to optics cabinet near H1-PSL enclosure 09:35 Travis – Out of the LVEA 09:39 Corey – Going to End-Y 09:41 Apollo – Starting up A/C units for DCS 09:55 Richard – Swap IR Spool (X arm) camera zoom lens 10:20 Jodi & Travis – Going to Mid-X and Mid-Y to look for parts 10:24 Elli – Going to X-Arm Spool 10:52 Dan – Giving a tour of LVEA for students 10:53 Jodi & Travis – Back from the Mid stations 10:55 King Soft on site to take water samples 11:10 Richard – Out of LVEA 13:07 Filiberto & Ed – Going to End-Y to remove 3IFO power supplies 14:25 Corey – Going into the LVEA 14:31 Corey – Out of the LVEA 15:00 Guardian training in OSB large conference room