Kyle, Gerardo Added remaining bolts to HAM1 West door and finished torquing -> Soft-closed GV5 and GV7 (GV5 hard-closed on its own at only 20 psi) -> Pumped HAM1 with scroll pump via vent/purge valve (as such, atmospheric pressure remains on air-side of closed vent/purge valve) -> Opened GV5 and GV7 Richard M. is investigating getting signal cables to HAM1 gauges