Seismic – Jim running tests on ETM-X, ITM-X, and HAM4 for Jeff K. Working on feed forward on HAM4 Suspensions – Stuart is rebuilding suspension models Installed switchable Mid-Stage coil Cleaning up old/unused channels PSL – Realigned the RefCav to bring power up to 1.5V. Tightened loose periscope mirror mounts. These could be the source of the alignment drift. 3IFO – Jodi and team parts hunting in the LVEA. They moved the IO parts top the staging building. The remaining three desiccant cabinets were moved to the VPW Danny checked optics for first contact The Seismic team moved the last BSC-ISI into its storage container FAC/VAC – Roughing on HAM1. Kyle needs to install a temporary gauge onto of HAM1 SnoValley – On site working on A/C at VPW and chiller yard OpLev – Modifying grout forms. Hope to start grouting OpLev piers next week