Reports until 10:48, Wednesday 25 February 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 10:48, Wednesday 25 February 2015 (16915)
Morning Meeting Minutes
Seismic – Jim running tests on ETM-X, ITM-X, and HAM4 for Jeff K. 
Working on feed forward on HAM4

Suspensions – Stuart is rebuilding suspension models
Installed switchable Mid-Stage coil 
Cleaning up old/unused channels 

PSL – Realigned the RefCav to bring power up to 1.5V. Tightened loose periscope mirror mounts. These could be the source of the alignment drift.  

3IFO – Jodi and team parts hunting in the LVEA. 
They moved the IO parts top the staging building.  
The remaining three desiccant cabinets were moved to the VPW	
Danny checked optics for first contact
The Seismic team moved the last BSC-ISI into its storage container

FAC/VAC – Roughing on HAM1. 
Kyle needs to install a temporary gauge onto of HAM1
SnoValley – On site working on A/C at VPW and chiller yard
OpLev – Modifying grout forms. Hope to start grouting OpLev piers next week