Today, Travis and I hung the ITMy monolithic lower chain in a triple. Jason can fill in the numbers more completely, but we reconfirmed that the pitch error between the test mass and PUM was 1-2mRad (single pendulum hang). The PUM to UIM differential pitch was ~5mRAD (double hang) and there was a pretty serious mis-pitch on the UIM when hung in a triple from the triple hang tooling. We made one round of adjusting masses on the UIM, but have more work to do there tomorrow.