Displaying report 1-1 of 1.
Reports until 16:02, Thursday 26 February 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:02, Thursday 26 February 2015 (16955)
Ops Day Shift Summary
LVEA: Laser Hazard
Observation Bit: Undisturbed   

07:15 Karen & Cris – Cleaning in the LVEA
08:00 Reset Observation Bit to Commissioning
08:12 Jim – Running testing on HAM4 & HAM5
08:14 Filiberto – Cabling vacuum gauge at HAM1
08:15 Elli – Going to HAM1 area to look for parts
08:15 Hugh – Doing HEPI maintenance at End-Y & End-X
08:20 Elli – Out of the LVEA
08:39 Nutsinee – Going to End-X to recycle PCal camera
08:52 Jim – Finished testing
09:12 Nutsinee – Back from End-X
09:23 Adjusted ISS RefSignal to reduce diffracted power
09:41 Kiwamu – Transition LVEA to Laser Safe
09:55 Sudarshan – Installing accelerometers on IOT2R and ISCT6
10:30 Mitch – Working in the LVEA on 3IFO stuff
10:50 Dave & Jim – Moving fibers at End-Y & restart End-Y PEM/PCal model
10:52 Betsy – Making Safe.Snap of all CS suspensions
11:21 Filiberto – Going to Mid-Y to get parts
11:32 Dave & Jim – Back from End-X
11:33 Dave & Jim – Going to End-Y to move fibers
11:52 TJ – Going to End-Y and End-X to drop off tools
12:10 Kyle – Closing GV5 & GV7
12:14 Dave & Jim – Back from End-Y – Restarting PEM models
12:15 Sheila – Transitioning LVEA back to Laser Hazard
12:16 Contractor on site to see Bubba
12:38 Karen – Cleaning at End-Y
12:44 Richard & Filiberto – Working on electronics at HAM1
12:53 Vender on site to stock snack machines
13:03 TJ – Back from End stations
13:08 Bubba – Going to End-Y to get equipment
13:44 Karen – Leaving End-X
13:45 Mitch – Out of the LVEA
14:05 Stuart & Jason – Running B&K testing of ITM-Y OpLev piers
14:10 Hugh – Going to End-Y to check HEPI
14:15 Richard – Restarting vacuum system computer
14:18 Dave – Restarting vacuum model
14:19 Dick – Going into LVEA to checking RF analyzer
14:35 Betsy, Mitch, & Travis – Going into the LVEA
15:05 Doug & Danny – Looking at OpLev piers to prep for grouting 
15:20 Sudarshan – Working on IOT tables
15:25 Doug & Danny – Out of the LVEA
15:25 Dough – Going to End-Y & End-X to check OpLev piers to prep for grouting
15:30 Stuart & Jason – Out of the LVEA
15:52 Sudarshan – Out of the LVEA
Displaying report 1-1 of 1.