LVEA: Laser Hazard Observation Bit: Undisturbed 07:15 Karen & Cris – Cleaning in the LVEA 08:00 Reset Observation Bit to Commissioning 08:12 Jim – Running testing on HAM4 & HAM5 08:14 Filiberto – Cabling vacuum gauge at HAM1 08:15 Elli – Going to HAM1 area to look for parts 08:15 Hugh – Doing HEPI maintenance at End-Y & End-X 08:20 Elli – Out of the LVEA 08:39 Nutsinee – Going to End-X to recycle PCal camera 08:52 Jim – Finished testing 09:12 Nutsinee – Back from End-X 09:23 Adjusted ISS RefSignal to reduce diffracted power 09:41 Kiwamu – Transition LVEA to Laser Safe 09:55 Sudarshan – Installing accelerometers on IOT2R and ISCT6 10:30 Mitch – Working in the LVEA on 3IFO stuff 10:50 Dave & Jim – Moving fibers at End-Y & restart End-Y PEM/PCal model 10:52 Betsy – Making Safe.Snap of all CS suspensions 11:21 Filiberto – Going to Mid-Y to get parts 11:32 Dave & Jim – Back from End-X 11:33 Dave & Jim – Going to End-Y to move fibers 11:52 TJ – Going to End-Y and End-X to drop off tools 12:10 Kyle – Closing GV5 & GV7 12:14 Dave & Jim – Back from End-Y – Restarting PEM models 12:15 Sheila – Transitioning LVEA back to Laser Hazard 12:16 Contractor on site to see Bubba 12:38 Karen – Cleaning at End-Y 12:44 Richard & Filiberto – Working on electronics at HAM1 12:53 Vender on site to stock snack machines 13:03 TJ – Back from End stations 13:08 Bubba – Going to End-Y to get equipment 13:44 Karen – Leaving End-X 13:45 Mitch – Out of the LVEA 14:05 Stuart & Jason – Running B&K testing of ITM-Y OpLev piers 14:10 Hugh – Going to End-Y to check HEPI 14:15 Richard – Restarting vacuum system computer 14:18 Dave – Restarting vacuum model 14:19 Dick – Going into LVEA to checking RF analyzer 14:35 Betsy, Mitch, & Travis – Going into the LVEA 15:05 Doug & Danny – Looking at OpLev piers to prep for grouting 15:20 Sudarshan – Working on IOT tables 15:25 Doug & Danny – Out of the LVEA 15:25 Dough – Going to End-Y & End-X to check OpLev piers to prep for grouting 15:30 Stuart & Jason – Out of the LVEA 15:52 Sudarshan – Out of the LVEA