Scott L. & Ed P. Cleaned and vacuumed all beam tube supports from single door south to X-1-4 double door. Cleaned 34 meters of beam tube in the same direction. Continuous monitoring of beam tube pressures by the control room operator and regular checks by the vacuum crew.