LHO VE
bubba.gateley@LIGO.ORG - posted 15:38, Wednesday 04 March 2015 (17080)
Beam Tube Washing
Scott L. Ed P. Chris S.

Frozen water in the D. I. tank made for a slow start this morning. Cleaned 50 meters moving south towards X-1-4 double doors. Tube pressures continually  monitored by control room and frequently by the vacuum crew.
Safety meeting this afternoon. 