07:00 - 08:00 Cris M. in LVEA ~ 8:00 Reverse Osmosis in alarm, notified John W. 08:10 Hugh transitioning BS ISI stage 2 to isolated, running measurements 08:54 Ed to H2 building 09:06 - 9:11 Sudarshan at end Y blocking PCAL beam 09:22 Elli to LVEA to align ITMX and ITMY spool cameras 09:56 Elli back 11:08 Jodi to mid station 12:30 Jodi back 13:33 Ed and Peter to H2 PSL enclosure to work on Livingston PMC 15:58 Ed and Peter done