Scott L. Ed P. Chris S. Today we were able to clean 50 meters of tube moving towards X-1-5 double doors. The afternoon was spent traveling to town to fill the diesel tank and fueling the support vehicles. Continuous monitoring of beam tube pressures by the control room operator.