Reports until 02:50, Tuesday 17 March 2015
H1 ISC
sheila.dwyer@LIGO.ORG - posted 02:50, Tuesday 17 March 2015 (17292)
progress today

Dan, Kiwamu, Sheila

Today we made several gaurdian changes:

I looked for a signal from the QPDs which was insensitive to TMS angle.  For the X arm pitch I used TRX A - 0.5 TRB and for Y arm pitch 1TRY_A-0.65 TRY_B seemed good.  I closed a verry low bandwidth loop to ITMX using this signal, screen shot is attached.  

We found that we could increase the recycling gain from ~27 to ~33 by moving the ITMs with ASC lops closed on IM4, PR2, BS, common ETMs, and differential ETMs.  We had to move ITMX by as much as 5 urad to do this, and we found that we would loose the lock soon after getting a good recycling gain.  Kiwamu calcualted that by moving ITMX 5 urad, we are moving the spot on the test masses by 1 cm assuming that the ETM is controlled. This may be due to a problem with the DHARD loop. 

We also spent some time looking for a Transmon QPD signal that would be insensitive to motion of the transmon.  We closed a loop to ITMX pitch using TRX_A - 0.5 TRX_B, the attached screenshot shows the settings.  This loop was verry low bandwidth.  

Images attached to this report