On Friday 20 Aug we started an N2 purge of the Transport container in which resides the HAM ISI assembly #1. The N2 flowed at ~30 l/min for about 6hours. We dropped the flow to a few l/min for the weekend and then ramped it back to about 10 l/min for the remainder of the week. Attached is the trend of the temp/dew point/humidity of the exhaust. Purge was stopped Friday afternoon 27 August.