LVEA: Laser Hazard Observation Bit: Commissioning 07:00 Karen & Cris – Cleaning in the LVEA 08:22 Hugh – LVEA for HEPI maintenance work 08:36 Jodi – In the LVEA for 3IFO stuff 08:37 Christina – Forkliftng boxes from LSB to VPW 08:45 Jim B. – Starting work on the NTP server move 08:45 Matt – Turning on CO2-Y laser 08:50 Richard – Vacuum survey in the LVEA 08:51 HFD on site testing fire alarms 08:55 Kyle & Gerardo – Swapping out Ion pumps on HAM1 & HAM2 09:00 Peter, Jason & Ed – In the PSL for RefCav and FSS work 09:01 Corey – Working in the squeezer bay 09:34 Richard – Going to End-Y with HFD to test fire alarms 09:51 Hugh – Finished with HEPI in LVEA – Working on pump controller. 09:52 Jodi – Out of the LVEA 10:00 Praxair delivering N2 to Mid-X 10:03 Paradise Water on site 10:30 Filiberto – Working on TCS-X RF cabling 10:48 Richard – Back from End-Y 10:55 Kiwamu – Checking IOT2L for beam clipping 11:00 Doug – Looking for OpLev parts near HAM2 11:00 Peter, Jason, & Ed – Finished in the PSL 11:05 Reset HEPI watchdog counters 11:38 Dave – Restarting new PEM corner station model & making cable changes in CER 11:42 Kyle & Gerardo – Out of the LVEA 11:50 Dave – DAQ restart 11:50 Kiwamu – Out of the LVEA 12:35 Karen – Going to End-Y 12:35 Cris – Going to End-X 12:43 HFD on site testing smoke alarms at End-X 13:10 Kyle & Gerardo – Leak checking at HAM1 & HAM2 13:51 Karen – Leaving End-Y 13:52 Filiberto – Connecting TSC RF cables 13:55 Kiwamu – Checking mirror pointing in IOT2L 14:22 Filiberto – Out of the LVEA 14:30 Kiwamu – Out of the LVEA 14:41 Jason – In LVEA getting parts from the OpLev cabinet 14:56 Jason - Out of the LVEA