Displaying report 1-1 of 1.
Reports until 17:38, Saturday 21 March 2015
H1 SEI (ISC)
kiwamu.izumi@LIGO.ORG - posted 17:38, Saturday 21 March 2015 (17377)
ISI ETMX stage 1 switched to 45 mHz blend

I noticed that the X arm green PDH was not able to keep up with the longitudinal motion today. It kept unlocking every 5-10 seconds. I  am not sure if this is due to high wind today. The roof wind monitors read 20 mph on average and reached 40+ mph at highest in this after noon.

I switched the ISI-ETMX stage 1 back to low blend, 45 mHz in X direction (which is exactly opposite of what Sheila's instruction says in alog 16583) without the BRS correction. This apparently helped the PDH locking as it became able to stay locked.

Displaying report 1-1 of 1.