Summary:
Along with the first day of the NSF Review, we had our first snow of the season.
Day's Activities:
-
There was plenty of SUS activity dealing with the Quad. I mainly kept an eye on dust levels (Dust Monitor 3 & 4) while they were out there. There were a few high variences ("high" being anything over ~150 counts/min), but nothing was sustained for more than a minute or two, so I did not need to call them.
-
nds0 was taken down for a short while during some frame writer work. It's back.
-
There was talk of moving the H2 Meatlockers out to the off-site warehouse.
-
NOTICE: The RED TCS Enclosures are sensitively aligned. No one should disrupt/bump these tables!
-
HAM-ISI was installed on the Staging Building's 2nd SEI Test Stand.