Reports until 16:02, Monday 23 March 2015
H1 General
edmond.merilh@LIGO.ORG - posted 16:02, Monday 23 March 2015 (17382)
Daily Ops Summary

07:00 Cris and Karen into the LVEA

08:25 RMS wathcdogs tripped on ETMs. ETMY reset from medm reset. ETMX still showing a trip on L2 UL.

08:53 RMS trip on L2 ETMX cleared by power cycle

09:35 ISS diff power was up to 10% +. I adjusted the refsignal to (-)2.07 for a net diffracte power of ~7%.

10:07 R McCarthy back from installin ESD filter at EY

10:16 Bubba to start greasing fans at mid stations. (MidX first)

10:45 Jim switched end stations from 45MHz ISI filter blendsto 90MHz filter blends due to the SSW winds exceeding 35-40 mph.

11:21 Jodi to MidY

11:34 Bubba movning to mid Y 

12:02 Very windy day today. Sustained winds at ~26mph with gusts exceeding 40 at times

12:15 D Barker and J Batch to EX (non VEA)

12:55 Bubba and John to EX to grease fans

13:27 D Barker and J Batch to EY (non VEA) to address TCT (timing) problem.

13:46 Bubba and John to EY to grease fans

14:30 Calum and Kate on site

14:35 Bubba and John back from Ends. 

16:00 Bubba done with fans.