edmond.merilh@LIGO.ORG - posted 15:56, Tuesday 24 March 2015 (17416)
Daily Ops Summary

07:00 Cris and Karen into LVEA

08:08 IFO Fully locked at LOWNOISE_ESD_ETMY - ~18Mpc.

08:15 Gerardo into LVEA

08:25 Gerardo out of the LVEA

08:49 Joim installing new isolation filters on BS

08:49 Heintze out to LVEA -TCS

08:57 Gerardo out to LVEA - HAM1

09:08 Corey out to squeezer bay 

09:14 Ellie out to LVEA - HAM1 area

09:18 Betsy out to LVEA

09:21 Jim W and TJ to EX

09:30 Jim B to EY to install Time Code Translator.

09:21 Jim W and TJ back from EX

09:53 Gerardo out of LVEA - Fil and Andres are still in pulling RF cables around HAMS 3,4

10:00 Jodi and Gary out of the LVEA

10:23 D Barker and J Batch back out to EY

10:25 HFD on site

10:58 Doug Cook out to LVEA - running a box of parts out to a cabinet.

11:08 P King into H2 enclosure

11:15 D Barker restarting ASC

11:42 P King out of H2 enclosure

12:07 Matt outnof LVEA

12:08 Dave amd Jim back to EX

12:10 Fil and co. out of LVEA

12:38 Dave and Jim back from EX - DAQ restart imminent 

12:42 DAQ restart

12:56 Karen @ EY

13:43 Karen Leaving EY

14:50 Fill out to LVEA to make some  measurements for cables

15:00 Kyle and Gerardo to MidX

15:07 Fil out of LVEA

 

 