07:00 Cris and Karen into LVEA
08:08 IFO Fully locked at LOWNOISE_ESD_ETMY - ~18Mpc.
08:15 Gerardo into LVEA
08:25 Gerardo out of the LVEA
08:49 Joim installing new isolation filters on BS
08:49 Heintze out to LVEA -TCS
08:57 Gerardo out to LVEA - HAM1
09:08 Corey out to squeezer bay
09:14 Ellie out to LVEA - HAM1 area
09:18 Betsy out to LVEA
09:21 Jim W and TJ to EX
09:30 Jim B to EY to install Time Code Translator.
09:21 Jim W and TJ back from EX
09:53 Gerardo out of LVEA - Fil and Andres are still in pulling RF cables around HAMS 3,4
10:00 Jodi and Gary out of the LVEA
10:23 D Barker and J Batch back out to EY
10:25 HFD on site
10:58 Doug Cook out to LVEA - running a box of parts out to a cabinet.
11:08 P King into H2 enclosure
11:15 D Barker restarting ASC
11:42 P King out of H2 enclosure
12:07 Matt outnof LVEA
12:08 Dave amd Jim back to EX
12:10 Fil and co. out of LVEA
12:38 Dave and Jim back from EX - DAQ restart imminent
12:42 DAQ restart
12:56 Karen @ EY
13:43 Karen Leaving EY
14:50 Fill out to LVEA to make some measurements for cables
15:00 Kyle and Gerardo to MidX
15:07 Fil out of LVEA