8:04 Jeff B. to LVEA checking on HAM6 vent prep
8:18 Jeff B. out
9:28 Kyle to EX collecting stuff for HAM6
9:46 Fil to H2 PSL area for dewpoint meter cabling
9:50 Bubba to EX
9:54 Jeff B. don moving dessicant cabinet to high bay
10:14 Bubba back
10:15 Kyle back
10:41 Richard and Fil to EE bay, Fil to H2 PSL area
10:48 Jeff B. to LVEA checking dust monitor at HAM6
11:12 Richard and Fil back
12:34 Elli to HAM1 checking out equipment
12:43 Elli back
13:14 Kyle to HAM6
13:41 Elli to LVEA
13:46 Hugh locking HAM6 HEPI
14:54 Sudarshan to LVEA
15:00 Daniel to EY
15:10 Hugh back
15:27 Suresh to LVEA adjusting HAM3 OpLev
15:34 Ed to LVEA assisting Suresh
16:00 Ed and Suresh back