H1 General
travis.sadecki@LIGO.ORG - posted 16:02, Monday 06 April 2015 (17704)
OPS Shift Summary

8:04 Jeff B. to LVEA checking on HAM6 vent prep

8:18 Jeff B. out

9:28 Kyle to EX collecting stuff for HAM6

9:46 Fil to H2 PSL area for dewpoint meter cabling

9:50 Bubba to EX

9:54 Jeff B. don moving dessicant cabinet to high bay

10:14 Bubba back

10:15 Kyle back

10:41 Richard and Fil to EE bay, Fil to H2 PSL area

10:48 Jeff B. to LVEA checking dust monitor at HAM6

11:12 Richard and Fil back

12:34 Elli to HAM1 checking out equipment

12:43 Elli back

13:14 Kyle to HAM6

13:41 Elli to LVEA

13:46 Hugh locking HAM6 HEPI

14:54 Sudarshan to LVEA

15:00 Daniel to EY

15:10 Hugh back

15:27 Suresh to LVEA adjusting HAM3 OpLev

15:34 Ed to LVEA assisting Suresh

16:00 Ed and Suresh back