Dan & Koji
We've finished most of the ISC work in the HAM6 chamber. Details are coming later.
The left-over ISC items are:
1) Cable ground short inspection
2) Checking functionarity of the picomotors and fast shutter.
These should be done tomorrow before closing the door.
The PSL rotation stage was energized again.
The laser power incident on the IMC was returned to 2.8W.
The PSL laser shutter between PSL and HAM1 is closed.
But technically to say, the LVEA is still laser hazard until it is declared to be safe.