07:50 Jeff B. to HAM6 08:00 Daniel S. restarting h1lsc model, errors 08:12 Daniel S. restarting h1ecatc1 08:41 Elli and Nutsinee to end Y 09:13 Rick, Travis and Sudarshan to end Y to work on PCAL 09:25 Filiberto and Koji to HAM6 to check grounding 09:31 Rick to end Y 09:34 Peter K. to H2 PSL enclosure 09:38 Hugh de-isolated HEPI on HAM1, going out to check clearances 09:52 Jeff B. to 3IFO storage area to put optics in the desiccant cabinet 10:03 Hugh back 10:12 Betsy to HAM6 10:18 Jeff B. done 10:20 Karen to mid Y, Cris to mid X 10:49 Jeff B. to HAM6 to check on dust monitor reporting low battery alarm 10:55 Jeff B. back, dust monitor plugged back in 11:01 Richard to LVEA to check on Filiberto 11:08 Richard back 11:12 Karen leaving mid Y 11:30 Koji and Filiberto out, found short 11:44 Peter K. out of H2 enclosure 12:12 Greg G. turning on TCS X laser 12:47 Tour in CR 13:18 Elli and Nutsinee back from end Y 13:31 Rick, Travis and Sudarshan back for lunch 13:32 Hugh reisolating HAM1 13:33 Richard to LVEA to look at dewpoint sensor and check on Filiberto 13:50 Elli and Jeff running excitation on etmy 13:54 Jeff and Elli stopping etmy excitation, starting etmx excitation 13:56 Jeff stopping excitation on etmx 14:13 Peter K. transitioning LVEA to laser safe 14:21 Richard to LVEA to look at dewpoint sensor and check on Filiberto 14:36 LVEA transitioned to laser safe 14:42 Richard back door being tacked on 14:54 Elli and Nutsinee to end X 15:25 Dave restarting ASC model 15:36 Jason and Suresh replacing SR3 optical lever laser