08:18 Jeff B. to LVEA, check desiccant cabinet, recover contamination control supplies 08:46 Joe to LVEA, check forklift battery, eyewash stations 08:46 Filiberto to LVEA, work on LTS dewpoint sensors by H2 enclosure 08:55 Jeff B. done 09:11 Richard to LVEA to check on Filiberto Richard back 09:40 Corey to LVEA to pick up supplies from HAM6 work 09:41 Peter K., Jeff B. to H1 PSL enclosure to work on FSS servo 09:44 Delivery from Platt electric 09:45 Corey to H1 PSL enclosure with Peter K. and Jeff B. 09:50 Doug to LVEA to take picture of optical lever installation John and Bubba craning platform in LVEA 09:58 Elli and Nutsinee to end X, HWS work 10:06 Betsy and Andres to LVEA to pick up equipment in east and west bay 10:07 Doug back 10:10 Richard looking at H1 PSL air shower 10:16 Richard done 10:27 Joe done 10:34 Corey done 10:51 Bubba, John drilling holes for platform posts in LVEA 11:12 Gerardo and Kyle starting pumpdown of HAM6 11:13 Travis and Sudarshan to end X, PCAL 11:56 Betsy running undamped transfer functions on PR3 M3, undamped spectra on SRM, SR2, SR3 12:11 Hugh deisolating HAM1 HEPI 12:28 Elli and Nutsinee back 12:40 Vending machine truck through gate 12:54 Tours in CR 13:38 Peter K. out of H1 PSL enclosure 13:58 Corey to squeezer bay, checking for equipment to install beam dump on HAM2 14:43 Jason and Ed to take voltage reading from field box near H1 PSL 14:53 Jason and Ed done 14:56 Bubba back to LVEA to continue drilling holes for platform posts 15:12 Corey and Keita climbing on HAM2 to test fit of beam dump 15:35 Peter K. to H1 PSL enclosure 15:43 Suresh to end X to set whitening filters on optical lever laser 16:30 Corey and Keita done