Displaying report 1-1 of 1.
Reports until 16:33, Thursday 09 April 2015
LHO General
patrick.thomas@LIGO.ORG - posted 16:33, Thursday 09 April 2015 (17767)
Ops Summary
08:18 Jeff B. to LVEA, check desiccant cabinet, recover contamination control supplies
08:46 Joe to LVEA, check forklift battery, eyewash stations
08:46 Filiberto to LVEA, work on LTS dewpoint sensors by H2 enclosure
08:55 Jeff B. done
09:11 Richard to LVEA to check on Filiberto
Richard back
09:40 Corey to LVEA to pick up supplies from HAM6 work
09:41 Peter K., Jeff B. to H1 PSL enclosure to work on FSS servo
09:44 Delivery from Platt electric
09:45 Corey to H1 PSL enclosure with Peter K. and Jeff B.
09:50 Doug to LVEA to take picture of optical lever installation
John and Bubba craning platform in LVEA
09:58 Elli and Nutsinee to end X, HWS work
10:06 Betsy and Andres to LVEA to pick up equipment in east and west bay
10:07 Doug back
10:10 Richard looking at H1 PSL air shower
10:16 Richard done
10:27 Joe done
10:34 Corey done
10:51 Bubba, John drilling holes for platform posts in LVEA
11:12 Gerardo and Kyle starting pumpdown of HAM6
11:13 Travis and Sudarshan to end X, PCAL
11:56 Betsy running undamped transfer functions on PR3 M3, undamped spectra on SRM, SR2, SR3
12:11 Hugh deisolating HAM1 HEPI
12:28 Elli and Nutsinee back
12:40 Vending machine truck through gate
12:54 Tours in CR
13:38 Peter K. out of H1 PSL enclosure
13:58 Corey to squeezer bay, checking for equipment to install beam dump on HAM2
14:43 Jason and Ed to take voltage reading from field box near H1 PSL
14:53 Jason and Ed done
14:56 Bubba back to LVEA to continue drilling holes for platform posts
15:12 Corey and Keita climbing on HAM2 to test fit of beam dump
15:35 Peter K. to H1 PSL enclosure
15:43 Suresh to end X to set whitening filters on optical lever laser
16:30 Corey and Keita done
Displaying report 1-1 of 1.