Reports until 16:06, Friday 10 April 2015
LHO General
patrick.thomas@LIGO.ORG - posted 16:06, Friday 10 April 2015 (17805)
Ops Summary
08:52 Hugh to HAM6 to unlock HEPI
08:53 Richard pushing reset button on h1nds1
09:01 Filiberto near BSC1, 2, 3 measuring lengths for new CPS cables
09:07 Gerardo to LVEA to start preparation for leak checking HAM6
09:24 Kyle leak checking HAM6
09:41 Hugh done
      Hugh running linearity test on HAM6 HEPI
10:36 Sudarshan and Travis to end X to work on PCAL calibration
11:24 Gerardo, Corey and Keita to HAM2 to install beam dump
11:28 Robert to end X and end Y to measure IO chassis
12:03 Gerardo done helping Corey and Keita, Peter K. transitioning the LVEA to laser hazard
12:15 LVEA transitioned to laser HAZARD
12:28 Kyle switching HAM6 to ion pump
12:39 Travis and Sudarshan back
      Corey and Keita back to HAM2
12:56 Greg G. turning on TCS X laser
13:36 Dick G. to squeezer bay looking for optic
14:35 Kyle and Gerardo roping off area around HAM6 to protect turbo pump
15:09 Corey and Keita done, Kyle starting work to open GVs