Scott L. Ed P. Chris S. This report will include the following dates, 4/8-4/10/15. Wednesday the crew was able to clean 75 meters of tube between X-1-8 double doors and 1st single door north to mid station. Safety meeting @ 3 P. M. Still a good day. Thursday the lights and equipment were relocated to last single door to mid station. Vacuumed tube supports and sprayed bleach/water solution on soiled floor areas. Cleaned 12 meters of tube. Today the crew was able to clean 70 meters from last single door north to mid station. Testing results are posted here.