Kyle, Gerardo We switched HAM5/6 annulus pumping over to the small annulus ion pumps and removed the pump carts -> The 500 l/s "main" ion pump was valved into HAM6 but we are leaving the turbo pump pumping in parallel with it over night - Commissioners - HAM6 high voltages components (picomotors, PZT and fast shutter) can be left energized/enabled without monitoring HAM6 pump curve now.