LVEA: Laser Hazard Observation Bit: Commissioning 07:00 Karen & Cris – Cleaning in the LVEA 10:05 John & 3IFO Group – in LVEA taking measurements at beam tube building exits 10:18 Gerardo – At HAM6 to turn off scroll pump 10:30 ISS FSS have been saturation and the IMC is dropping out of lock. Per Peter K. turned off the ISS Autolock to see if that stabilizes the FSS and IMC. 10:43 John & Co – Out of LVEA 10:45 Gerardo – Out of LVEA 12:20 FSS is still saturating and the IMC is dropping out of lock. Per Peter K. dropped the FSS Common Gain from 25 dB to 24 dB. 15:08 Gerardo – Going to H2-PSL enclosure