Reports until 15:59, Friday 17 April 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 15:59, Friday 17 April 2015 (17934)
Ops Day Shift Summary
LVEA: Laser Hazard
Observation Bit: Commissioning   

07:00 Karen & Cris – Cleaning in the LVEA
10:05 John & 3IFO Group – in LVEA taking measurements at beam tube building exits
10:18 Gerardo – At HAM6 to turn off scroll pump
10:30 ISS FSS have been saturation and the IMC is dropping out of lock. Per Peter K. turned off the ISS Autolock to see if that stabilizes the FSS and IMC.  
10:43 John & Co – Out of LVEA
10:45 Gerardo – Out of LVEA
12:20 FSS is still saturating and the IMC is dropping out of lock. Per Peter K. dropped the FSS Common Gain from 25 dB to 24 dB. 
15:08 Gerardo – Going to H2-PSL enclosure