filiberto.clara@LIGO.ORG - posted 09:19, Monday 20 April 2015 (17952)
STST-2 SN 88921 installed in Beer Garden PEM Area
PEM STS-2 S/N 88921 (from vault) was installed in beer garden, next to STS-2 ITMY-B. New seismometer will be connected tomorrow to help troubleshoot STS-2 ITMY-B. Unit was aligned along X-arm and leveled. Unit was left in unlock position.