J. Kissel In prep for the HAM-ISI and HAM-HEPI Model upgrade (see SEI aLOG 708, WP #5171, E1500207, and a slew of ECRs and Integration Issues), I've put together a step-by-step instructions of all of the everything that I need to do today and tomorrow. Most of these upgrades were tested at Stanford and MIT, so I don't expect too many problems with the infrastructure, but they can only test/describe so much: - they only have single chambers, not many chambers each with different top-leve needs - those chambers don't have SUS on them that need to stay aligned to anything, - they don't have IOP watchdog systems, - they don't have settings that the really care about in any of their SDF systems, - they don't have multiple STSs to store with distibution chassis, and - they don't have optical levers on their HAM-ISIs So this will be the first full-scale test and I wanted to get my ducks in a row before I touched anything. See attached.