Reports until 13:11, Tuesday 28 April 2015
H1 SEI
jeffrey.kissel@LIGO.ORG - posted 13:11, Tuesday 28 April 2015 (18078)
The Plan for HAM Model Upgrades
J. Kissel

In prep for the HAM-ISI and HAM-HEPI Model upgrade (see SEI aLOG 708, WP #5171, E1500207, and a slew of ECRs and Integration Issues), I've put together a step-by-step instructions of all of the everything that I need to do today and tomorrow. 
Most of these upgrades were tested at Stanford and MIT, so I don't expect too many problems with the infrastructure, but they can only test/describe so much:
- they only have single chambers, not many chambers each with different top-leve needs
- those chambers don't have SUS on them that need to stay aligned to anything, 
- they don't have IOP watchdog systems, 
- they don't have settings that the really care about in any of their SDF systems, 
- they don't have multiple STSs to store with distibution chassis, and
- they don't have optical levers on their HAM-ISIs 
So this will be the first full-scale test and I wanted to get my ducks in a row before I touched anything.

See attached.
Non-image files attached to this report