Reports until 15:48, Friday 08 May 2015
H1 CDS
james.batch@LIGO.ORG - posted 15:48, Friday 08 May 2015 (18332)
Interruption of CDS network to EY
The CDS switch at EY needed to be power-cycled to allow us to do a password recovery procedure. This interrupted data collection for vacuum channels, the HEPI pump controller, and weather station for the end station.  Vacuum data has a gap from approximately 13:51 PDT to 14:06 PDT.

EY Weather was restored at 3:47

EY dust seems to have not been affected.