Displaying report 1-1 of 1.
Reports until 16:09, Sunday 10 May 2015
H1 ISC
eleanor.king@LIGO.ORG - posted 16:09, Sunday 10 May 2015 (18349)
SrC measurement stuff

Nutsinee, Elli

Today we noodled around a bit, but still don't have a measuremnt of SRC length.  Once Rick had reset the PSL trip, we spent of time recovering the alignment, locked DRMI, got were ready to take a measurement when the PSL tripped again.  Just like this morning, the PSL stystem status screen only showed the interlock ok bit was tripped.  The diode chiller flow bit was green and the chiller was working fine.  After talking to Rick,  we used the PSL card in the key storage box in the control room to get into the diode room and  reset the PSL.  We are starting to get tired, and are calling it a day.

Displaying report 1-1 of 1.