IAS: D. Cook, J. Oberling
SUS: B. Bland
We performed the final test stand alignments for the BSC08 Quad today. Pitch was adjusted on the ITM and the ITM/CP gap was measured and the parallelism set.
-
ITM pitch: ~35 µrad up
-
ITM/CP parallelism (±0.25mm spec = ±5'3" of angle = ±1.47 mrad)
-
CP pitch: ~364 µrad up
-
CP yaw: ~2.04 mrad left
-
After discussing with Dennis, it was decided that we would not adjust the CP yaw
-
ITM/CP gap: 19.96mm
-
ITM pitch (after CP adjustments): ~54 µrad up
This was the last of the test stand alignments. The cartridge has now been handed off to the testers to complete required tests before the cartridge install.