Displaying report 1-1 of 1.
Reports until 16:08, Tuesday 12 May 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:08, Tuesday 12 May 2015 (18387)
Ops Shift Summary
LVEA: Laser Hazard
Observation Bit: Commissioning 
  
07:00 Karen & Cris – Cleaning in the LVEA
08:16 Karen – Out of the LVEA
08:17 Karen – Cleaning at End-Y
08:30 Filiberto – Cabling work at BSC1, BSC2, BSC3 & HAM4
08:30 Elli – Hartman work at End-Y
08:35 Jason & Perter – RefCav alignment work H1-PSL
08:40 Kyle – Bake out of RGA and pump work at End-Y
08:48 Hugh – Moving HAM2 seismometer to Beer Garden area
08:54 Jim – Sensor correction work on ETM-X
08:55 Bubba – 3IFO crane work in LVEA North Bay area
09:00 Add 125ml water to Crystal chiller
09:00 Jodi – 3IFO PM work at Mid-X and Mid-Y
09:01 Elli – Back from End-Y 
09:02 Elli – Going to LVEA to work on Hartman sensor
09:16 Nutsinee – Going into the LVEA
09:18 Paradise Water - delivery on site
09:25 Elli & Nutsinee – Out of the LVEA
09:30 Kyle – Going to Mid-X 
09:31 Robert – Staging in PSL for periscope tuning
09:42 Joe – Checking batteries in the LVEA
09:50 Karen – Finished at End-Y
09:53 Cris – Finished in LVEA – Going to End-X
09:56 Mitch – Going to Mid and End Y 
10:05 Nutsinee & Elli – Going to End-Y
10:13 Joe – Out of the LVEA
10:37 Elli & Nutsinee – Back from End-Y
10:40 Mitch – Back from Mid & End stations
10:43 Dave & Jim – Going to End-Y for atomic clock calibration 
10:58 Mike – Tour of LVEA ahead of VIP tour on 05/19
11:12 Elli & Nutsinee – Checking the TCS-X laser
11:23 Kyle – Back from Mid-X
11:30 Jason & Peter – Finished in the PSL
11:30 Robert – Going into the PSL for periscope work
11:32 Elli & Nutsinee – Out of LVEA
11:33 Jim & Dave – Finished at End-Y 
11:40 Jim – Going to End-X for atomic clock calibration
11:41 Elli & Nutsinee – Checking the TCS-Y laser
11:42 Jeff – DAQ restart
11:45 Filiberto & Andres – Finished in LVEA
11:48 Truck on site for tape robot move
12:04 Elli & Nutsinee – In LVEA working on Hartman sensor at TCS-HT4
12:15 Jim – Back from End-X
12:20 Kiwamu & Jason – Finished with OpLev-PR3 alignment
13:15 Jodi & Jim – In LVEA to recover a broken computer
13:29 Nutsinee & Elli – Out of the LVEA
13:31 Jodi & Jim – Out of the LVEA
14:12 6.8 Magnitude EQ in Japan 
14:15 Robert – Finished with PSL periscope alignment