Scott L. Ed P. Chris S. (Cris M.1/2 day) 5/11/15 45.7 meters cleaned ending at HNW-4-040. Test results posted here. Removed lights, refilled D.I. water tank and relocated all equipment to next section north. 5/12/15 The crew began hanging lights,vacuuming support tubes and spraying bleach/water solution. Cleaned 54.9 meters ending 11.5 meters north of HNW-4-042. 5/13/15 Cleaned 67 meters ending at HNW-4-046. To date, we have cleaned a total of 2902 meters of tube.