H2 SUS
betsy.weaver@LIGO.ORG - posted 22:05, Tuesday 06 December 2011 (1847)
BSC6 ETMy
This afternoon the ETMy PUM glass mass was loaded into the Lower Structure marked in the fiber welding cleanroom at EY. The ETMy optic is at the end station and will be loaded tomorrow morning. Setting the mass positions relative to each other and the structure, and setup of the fiber equipment will likely continue through Wed, with welding hopefully starting sometime Thursday.