PeterK, JanP, MichaelR, RickS Yesterday, we made some final parameter measurements for the H1 PSL, inspected the pump fiber surfaces, then shut down and began dismantling the H1 PSL. As of last evening, the pump fibers have been pulled back to the H1 Laser Diode Room, the electronics racks have been partially gutted, and we are beginning to remove components from the table. Right now we are focusing on the components that we will reuse for the H1 aLIGO PSL. We expect this process to continue into next week, partly because we want to spend as much time as possible working with JanP on the H2 PSL this week, which is his last before heading back to Germany on Friday. We will post the measurement and inspection results shortly.