Today started off with VEAs being transitioned to Laser Safe and many activities beginning with the AA/AI Chassis swap being the prime activity.
	- 
		7:00 Cris/Karen cleaning
 
	- 
		7:55 Turning off ALS lasers (Richard/Peter)
 
	- 
		8:45amPowered off TCS CO2 Lasers via medm (Peter turned key on power supply)
 
	- 
		10am:  ISCT EX Access System Sensors (Ken)
 
	- 
		10:20:  EX HEPI Pump station started alarming.  Looks like it's noise from a poorly grounded Sensor (noted by Hugh).
 
	- 
		10:30 A Bing Car (with camera on roof) zipped around the LSB/Front Gate (attached)
 
	- 
		10:33-11:01 Jodi sealing up 3IFO containers.
 
	- 
		11:17 Travis running hardware to AA/AI crew at end stations
 
	- 
		11:25 Tomorrow tour prep in LVEA (Hugh)
 
	- 
		ISS instable, RefSignal moved from -1.95 to -1.93.
 
	- 
		Jim/Richard - shutting down EX, so offline - went offline before we could complete the change to SAFE/OFFLINE.  Cheryl set Guardian to request SAFE/OFFLINE for SUS and SEI.
 
	- 
		Filiberto called - we changed all corner station and EY SUS and SEI to SAFE/OFFLINE, EY may not have been necessary for today, but with everything else down, it made sense to do EY also.
 
	- 
		1:30-3:30 Jeff checking garb at all VEAs
 
	- 
		3pm Mid-stations were getting warm (received FMCS alarms), so Bubba turned on the Air Handlers.
 
	- 
		3:05:  Bubba off to EX Lab room to check on HVAC unit
 
	- 
		3:11-3:30 Jodi in LVEA for 3IFO again
 
	- 
		3:30 CDS crew came to take a break from EX work, but will be heading back out to continue working on power supply stuff.
 
	- 
		3:20 AA/AI crew continue work in H1 Elec Room & are now working on PSL (Filiberto, Richard, et. al)
 
	-