Full room (with visitors for Dedication tomorrow and AA/AI work this week)
Subsystem Summaries
-
SEI: Mostly offline due to AA/AI work.
-
SUS: Model work during AA/AI work.
-
CDS: Lots summarized here: AA/AI chasis work in corner stations. VEAs transistioned safe. Lasers shuttered and/or turned off. Access Control door sensors on tables. Timing system work as well. Hope to be done by Wed, but have until Thurs at noon officially.
-
Facilities: touch up on site, beam tube ongoing
-
VAC: Ion gun work by Rai?
-
PSL/PCal/Oplev: Might take the PSL down during the AA/AI work. Possible investigations into trips may continue
-
Commissioning: AI chasis measurements,
Tent set-up for lunch tomorrow
Additional NOTES:
-
Don't push the Control Room Conference Table toward the door (for safety/fire alarm reasons)
-
No Commissioning Meeting