peter.fritschel@LIGO.ORG - posted 18:57, Wednesday 20 May 2015 (18541)
Guralp setup at End-Y disconnected and cleaned up

The Y end station had a Guralp seismometer set up with some clearly temporary electronics: cables strung on the floor and in front of racks; power supply and breakout boxes on the floor. With the work going on in the Y-end VEA to install the new ES-Driver, this set up was getting in the way, and posing a tripping hazard. As the work permit run-through in the morning meeting revealed no permit for this setup, I took the liberty of disconnecting the cables and cleaning things up. The Guralp itself was not moved, but signals are no longer being acquired (if indeed they were before).