08:00 IFO relocked
08:02 OIB switched to commissioning
08:06 Jodi into the LVEA, no one in working yet, I gave permission....lock loss. :/
08:15 Jodi out of the LVEA
08:23 Christine to Forkift from LSB to wherehouse
08:25 DAQ overview is showing eveidence of excitation sessions on SUSITMX and SUSETMY....FYI
08:28 R Savage going to EY for PCAL calibration
08:36 Inspiral range FOM m(video6 upper) won't restart. J Batch says it very broken.
08:51 ISS AOM diff power was down to ~4%. REFSIG adjusted to -2.01 from -2.03 to brin Diff Power to ~ 8%.
09:02 Darkhan in an going to EY to join Rick.
09:20 RO alarming
09:30 TJ to EX to tend to BRS
09:51 Bubba down X arm between Mid and End to inspect cleaning project.
09:56 Rick and Darkham back from EY
10:15 TJ back from EX
10:30 turned IFO over to Kiwamu for Mich calibration
11:05 Tour in the control room
11:20 second tour group into the control room
12:32 Sigg to MY
12:42 Kissel restarting the cal models in the ends and corner and then restarting the DAQ
12:46 DAQ back up
12:48 Darkhan to EY to retrieve equipment.
13:25 Darkhan back from EY
13:45 ALL HANDS MEETING
16:00 Hanging out late until Cheryl arrives