Reports until 16:28, Thursday 28 May 2015
H1 General
edmond.merilh@LIGO.ORG - posted 16:28, Thursday 28 May 2015 (18663)
Daily Ops Summary

08:00 IFO relocked

08:02 OIB switched to commissioning

08:06 Jodi into the LVEA, no one in working yet, I gave permission....lock loss. :/

08:15 Jodi out of the LVEA

08:23 Christine to Forkift from LSB to wherehouse

08:25 DAQ overview is showing eveidence of excitation sessions on SUSITMX and SUSETMY....FYI

08:28 R Savage going to EY for PCAL calibration

08:36 Inspiral range FOM m(video6 upper) won't restart. J Batch says it very broken.

08:51 ISS AOM diff power was down to ~4%. REFSIG adjusted to -2.01 from -2.03 to brin Diff Power to ~ 8%.

09:02 Darkhan in an going to EY to join Rick. 

09:20 RO alarming

09:30 TJ to EX to tend to BRS

09:51 Bubba down X arm between Mid and End to inspect cleaning project.

09:56 Rick and Darkham back from EY

10:15 TJ back from EX

10:30 turned IFO over to Kiwamu for Mich calibration

11:05 Tour in the control room

11:20 second tour group into the control room

12:32 Sigg to MY

12:42 Kissel restarting the cal models in the ends and corner and then restarting the DAQ

12:46 DAQ back up

12:48 Darkhan to EY to retrieve equipment.

13:25 Darkhan back from EY

13:45 ALL HANDS MEETING

16:00 Hanging out late until Cheryl arrives