Reports until 16:04, Friday 29 May 2015
H1 General
edmond.merilh@LIGO.ORG - posted 16:04, Friday 29 May 2015 (18688)
Daily Ops Summary

07:15 Rick to EY for PCal

08:00 Ops phone apparently not ringing

08:16 Sudarshan to EX end assuming Rick went there. Rick reported no one answered at ops. (ringer)

08:20 re-booted FOM video4

08:42 Kingsoft on site

09:10    Rick and Sudarshan to both end stations to do calibrations on Pcal. Will not be moving mirrors.

09:12 P King into LDR

09:15 Peter out of LDR

09:20 Jodi at MidX

09:25 Jodi out of MidX

09:31 Kingsoft off site

09:32 Bubba to begin strip installation on X arm just the other side of the berm

09:50 Richard to EX to check out phones

10:17 Richard back from EX

10:21 Jodi back from MidY.

10:53 Pcal team out of the Ends

11:00 Rick Nutsi and Sudarsh back from End stations

11:02 Pcal team back out to EY

11:05 2 tour groups in succession into the control room

12:30 Rick et al finished at EY

12:35 Begin initial alignment

12:42 Dark Mich locked

12:55 initiated ISC_LOCK

13:16 DC readout. will stay here and asses before proceeding to LSC_FF

14:30 Sigg went to MidY

14:45 Sigg back from MidY