09:22 Gerardo moving auxiliary pump cart out of LVEA 09:25 Gerardo done 09:40 Fire department car through gate 11:46 RO alarm, Bubba investigating 12:48 Tour in control room 13:15 5.9 EQ off Oregon coast breaks lock 15:10 Richard to end Y to look at cold cathode gauge used for high voltage ESD interlock 15:39 Richard back Locking went well until the EQ off the coast of Oregon. Investigations primarily centered on why DARM optical gain is changing between locks.